The
Slum Rehabilitation Authority (SRA) is empowered to prepare a Slum
Rehabilitation Scheme for areas within its purview. This would cover all
slums and hutment colonies within such area. The actual mechanics of
the Slum Rehabilitation Scheme are prescribed under the Development
Control Regulations of Greater Bombay, 1991 (‘DCR’) issued under the
Maharashtra Regional & Town Planning Act, 1956. Two types of Slum
Rehabilitation Schemes are permissible under the DCR and they are known
by the Regulations under which they are approved. These are:
The salient features of a transit scheme are as follows:
Appendix IV to DCR
The
ratio is as follows:
A typical Slum Rehabilitation Scheme involves the following steps:
(a) All slum/pavement inhabitants on electoral rolls on or before 1st January 1995 and who are actual occupants are eligible.
(b)
70% of such eligible occupants must come together to form a
co-operative housing society and pass a resolution appointing a chief
promoter who can apply for name reservation for the society. The chief
promoter can collect share capital of Rs.50 per member for slum
societies and Re.1 as entrance fees and to open a bank account in any
co-operative bank.
(c) The proposed society should get the plot surveyed and a map prepared showing the slum structures.
(d)
The proposed society must then take a decision to appoint a competent
developer for the society. He would act as the promoter.
(e) The
promoter can enter into an agreement with every eligible slum-dweller
while putting up a slum rehabilitation proposal to SRA for approval.
(f)
The Promoter has to appoint an architect to prepare the plans under DCR
33(10). He would submit the plans and proposal along with the scrutiny
fee. The SRA has recently decided that it would only permit contractors
registered with them to carry out slum rehabilitation schemes. The
decision follows complaints by slum-dwellers and non-government
organisations about the poor quality of construction in the
rehabilitation buildings.
(g) SRA would then scrutinise the plans and the proposal.
(h) SRA would give the letter of intent conveying approval to the scheme, approval to the layout, building-wise plan approval (Intimation of approval) and commencement certification. Earlier, these 4 were issued in instalments but now to speed up the process, they are issued in one go at least for the rehab proposal. The approval is valid for three months.
(i) The scheme must provide for temporary transit accommodation to the slum-dwellers, during the construction of rehab portion.
(j) Transit camp accommodation is provided by drawing of lots. Slum-dwellers are shifted to transit camps and huts are demolished. If these members do not agree to participate within 15 days of the approval of the proposal, they are physically evicted from the site under the provisions of sections 33 and 38 of Maharashtra Slum Areas (Improvement, Clearance and Redevelopment) Act, 1971, to ensure that there is no obstruction to the scheme.
(k) After demolition of the structures, work up to plinth is completed. After checking the plinth dimensions, further permission to carry out construction beyond plinth is granted.
(l) The architect submits the building completion certificate.
(m) While applying for the occupation certificate of the rehab building, the architect is expected to give the details of tenement allotments done by the society by drawing lots in the joint names of the household head and his spouse. SRA issues computerised ID cards.
(n) Sale building construction is taken up.
(o) Separate property cards are issued for the rehab and sale portion.
(p) Once all the buildings are constructed, the land is leased to the society of slum-dwellers.
In a very important decision in the case of Lokhandwala Infrastructure P. Ltd. & Others v. Om Omega Shelters & Others, Writ Petition No. 95 of 2011, the Bombay High Court has held that it was not open to the slum-dwellers’ proposed society to enter into agreements with developers as per their whims and fancies.
The High Court did not accept arguments made by two proposed societies of 500 slum-dwellers in Worli that they were entitled to enter into or terminate development agreements without scrutiny or regulation by government bodies. The Court held that “Such a proposition would lead to a chaotic situation in the implementation of slum rehabilitation schemes. Managing committee members of proposed societies would then be at liberty to pursue their private ends and switch loyalties between rival builders on considerations of exigency. Many slum rehabilitation projects land in Court with disputes over the appointment of rival builders by slum-dwellers, with each developer claiming majority. The HC said these development agreements are not purely private contracts and have a ‘public character’ to them as the aim is to rehouse slum-dwellers with dignity. “Often the land belongs to the state, the BMC or the housing board. The state has a vital public interest in ensuring that the schemes are not trammelled by private interests,” the court observed. “Once a developer has made a proposal to redevelop a slum, authorities have to scrutinise whether a proposal involving change of developer is in the interest of slum-dwellers and whether or not the new developer would fulfil the needs and requirements of the scheme and has the necessary capacity to do so and whether the new developer has the consent of 70% of slum-dwellers,” said the Judges, adding that the authorities have to determine if the new developer would be able to fulfil all the requirements. “The second developer cannot ride on the 70% consent given to the first developer as it would only lead to ‘misuse of the scheme.’ “The dispute between a society and the developer does not lie purely in the realm of a private contractual dispute. The dispute has an important bearing on the proper implementation of the slum rehabilitation scheme and its consequences go beyond the private interests of the society and the developer. The scheme involves other stakeholders, including public bodies which own the land, whose interest ought to be protected too.”
In the present case, the dispute was between Lokhandwala Infrastructure Pvt. Ltd. and Om Ome-ga Shelters. In 2002, Lokhandwala was appointed to redevelop a plot in Mumbai. 500 slum-dwellers, who resided on the plot, formed two societies. In 2003, it applied for sanction.
Nothing moved for six years. In 2009, the two societies issued a letter terminating their agreement with Lokhandwala. The SRA called for a meeting of the slum societies in February 2010. In November 2010, the two societies, at a general body meeting, claimed that 343 of 401 eligible slum-dwellers present had consented to Omega. Based on this, the SRA CEO approved Omega as the developer instead of Lokhandwala. Lokhandwala, which challenged the SRA order, as ‘perverse’ said its proposal had never been rejected. It argued, and the Court up-held, that the new developer cannot do away with the requirement of 70% majority consent. Omega said it had individual agreements with over 80% slum-dwellers. The slum-dwellers argued that they were entitled to make a proposal and that the “developer is merely an agent of the cooperative society” to provide tenements.
The Bombay High Court held that the SRA order left much to be desired and set aside the SRA’s order favouring Omega and asked the SRA to again hear both sides and decide whether Lokhandwala continues to enjoy the support of 70% slum-dwellers and, if not, whether Omega does.
Income-tax concession
Section 80-IB(10) of the Income-tax Act, 1961 provides for a deduction from the gross total income of profits derived by an undertaking from developing and building housing projects approved before 31st March 2008. The following two conditions which are normally applicable for claiming such a deduction are not applicable in the case of a slum rehabilitation project which has been notified by the CBDT:
(a) such undertaking completes the construction in a case where a housing project has been, or, is approved by the local authority on or after the 1st day of April, 2004, within four years from the end of the financial year in which the housing project is approved by the local authority.
(b) the project is on the size of a plot of land which has a minimum area of one acre.
Thus, the Act provides a relaxation to slum rehabilitation schemes.
The CBDT has by Notification No. 67/2010 [F.No. 178/37/2006-IT(A-I)]/SO 1898(E), dated 3-8-2010 notified the Scheme contained in Regulation 33(10) of Development Control Regulation for Greater Mumbai, 1991 read with the provisions of Notification No. TPB-4391/4080(A)/UD-11(RDP), dated 3rd June, 1992, as a scheme for the purposes of the said section subject to the following conditions, —
(i) slum development falling in Category VII mentioned in Notification No. TPB-4391/4080(A)/UD-11(RDP), dated 3rd June, 1992 shall be excluded from the Scheme;
(ii) slum development falling within clause 7.7 of the Appendix IV of regulation 33(10) which provides for joint development of slum and non-slum areas shall be excluded from the Scheme; and
(iii) any amendment in the Scheme hereby notified shall be required to be re-notified by the Board.
The CBDT has by Notification No. 01/2011 [F. No. 178/35/2008-IT(A-I)]/SO 14(E), dated 5-1-2011 notified, the Scheme for slum redevelopment prepared by the Maharashtra Government under sub-section (2) of section 37 of the Maharashtra Regional Town Planning Act, 1966 and published vide Notification No. TPS-1893/973/CR-49/93A/UD-13, dated the 26-2-2004, as a scheme for the purposes of the said section subject to the condition that any amendment to the Scheme hereby notified shall be required to be re-notified by the CBDT.
By a subsequent Notification, the CBDT has clarified that as the provisions of section 80-IB(10) apply only to housing projects approved before 31st March, 2008, the above Notifications would also be deemed to apply to housing projects approved by a local authority under the aforesaid scheme on or after the 1st April, 2004 and before 31st March, 2008.
Stamp duty concession
Under the Bombay Stamp Act, 1958, the Maharashtra Government has reduced the stamp duty chargeable under Article 5(g-a) (Development Rights Agreement), Article 25 (Conveyance) and Article 36 (Lease) executed for the purpose of rehabilitation of slum-dwellers as per the Slum Rehabilitation Schemes. The duty is reduced to Rs. 100 instead of the ad valorem rates specified under these Articles. However, the reduction of duty is permissible only in respect of instruments relating to tenements allotted to the slum-dwellers for residential purpose under the Slum Rehabilitation Schemes and is not allowed for the sale/free component buildings.
Service tax concession
No service tax is payable on the taxable service of construction of residential complex referred to in section 65(105)(zzzh) of the Finance Act provided to the Rajiv Awaas Yojna. Thus, any construction for slum rehabilitation under the RAY is exempt from service tax.
FDI
Foreign Direct Investment in companies engaged in slum rehabilitation schemes is governed by the conditions specified in the Consolidated FDI Policy of 2011/ erstwhile Press Note 2 of 2005. No relaxations or concessions are provided from these conditions to a company engaged in slum rehabilitation and any FDI in a company engaged in slum redevelopment needs to comply with the following key conditions:
(a) The minimum area to be developed under each project would be as under:
(i) In case of development of serviced housing plots, a minimum land area of 10 hectares/25 acres.
(ii) In case of construction-development projects, a minimum built-up area of 50,000 sq.mts
(iii) In case of a combination project, any one of the above two conditions would suffice.
(b) Minimum capitalisation of US$10 million for wholly-owned subsidiaries and US$ 5 million for joint ventures with Indian partners. The funds would have to be brought in within six months of commencement of business of the company.
(c) The original investment cannot be repatriated before a period of three years from the completion of minimum capitalisation.
Property tax concessions
The BMC has granted a concession in property taxes to any building constructed under a slum rehabilitation scheme under the Act. The concession was given in a phasewise manner. For the period of 2011 to 2015 the property taxes levied on such buildings would be 80% of the rate levied in a particular year.
Auditor’s duty
The Auditor should enquire of the auditee, in case the auditee is into slum rehabilitation, whether the terms and conditions of the Act have been duly complied. In case of any doubts, he may ask for a legal opinion. Non-compliance with this could have serious repercussions for the developer.
By broadening his peripheral knowledge, the Auditor can make intelligent enquiries and thereby add value to his services. He can caution the auditee of likely unpleasant consequences which might arise. It needs to be repeated and noted that the audit is basically under the relevant law applicable to an entity and an auditor is not an expert on all laws relevant to business operations of an entity. All that is required of him is exercise of ‘due care’.