New Construction in Mumbai

By Dr. Anup P. Shah, Chartered Accountant
Reading Time 9 mins

Introduction

Real estate development is big
business in a metropolis such as Mumbai. However, what happens if all new real
estate development is abruptly halted by the High Court? A large part of the
economy would come to a grinding halt. However, this is what happened in Mumbai
on account of an Order passed by the Bombay High Court. The Order was passed to
tackle the growing problem of solid waste management in the City and the
inefficiency of the Municipal Corporation of Greater Mumbai (MCGM) in tackling
it. Nevertheless, it caused a great deal of issues and strife for the real
estate community. Now, a Supreme Court Order has given some respite from this.

 

Bombay
High Court’s Order

A Public Interest Litigation (PIL)
was filed before the Bombay High Court against the inefficient disposal of
solid waste arising during construction of real estate properties in the City
of Mumbai. Based on this, the Bombay High Court passed its Order in the case of
Municipal Corporation of Greater Mumbai vs. Pandurang Patil, CA No.
221/2013 Order dated 29.02.2016.
  

 

The Court observed that everyday
the MCGM was illegally dumping over 7,400 metric tonnes of solid waste at its
dumping sites in Mumbai. This figure was expected to significantly increase on
various counts, including the several buildings being constructed in the City.
This illegal dumping would cause increased pollution along with posing fire
hazards. On the other hand, there were a large number of constructions going on
in the city. In fact, the State Government had amended the Development Control
Regulations by providing for grant of more and more Floor Space Index (FSI).
Thus, the Court held that the State Government was encouraging unsustainable
growth.

 

Further, under earlier PILs, the
High Court had granted time to the MCGM to set up waste disposal and processing
facilities at the dumping grounds which time had also expired and nothing was
done by the MCGM. The Court held that something drastic needed to be done to
improve the situation, such as, to impose some restrictions on the unabated
development in the city. Moreover, it was the duty of the Court to ensure that
the provisions of the Environment Protection Act,1986 and the Municipal Solid
waste (Management and Handling) Rules, 2000 were implemented in as much as the
breach thereof would amount to depriving a large number of citizens of Mumbai a
fundamental right guaranteed under the Constitution of India, which was, the
right to live in a pollution free environment.

 

Accordingly, the High Court
extended the time granted to the MCGM for installing waste processing
facilities till 30th June 2017. It noted that neither the said
Municipal Corporation nor the State Government had any solution whatsoever for
ensuring that the quantity of solid waste generated in the city should not
increase. Further, it was of the view, that the State Government was more
worried about the impact of imposing any restraint on the new constructions in
the city on the real estate industry. It felt that on one hand there was no
real possibility of any Authority complying with the Management of Solid Waste
Rules and on the other hand, the development by construction of buildings in
the city continued on a very large scale. There were also proposals for grant
of additional FSI by amending the Regulations. It therefore, was of the view
that, in case of certain development proposals, restrictions had to be imposed.
More so, because neither the State Government nor the Municipal Corporation has
bothered to make a scientific assessment of the impact of large scale
constructions going on in the city on the generation of the solid waste in the
city.

 

The Court was conscious of the fact
that in the city of Mumbai there were a large number of re-development projects
which were going on and the occupants of the existing premises might have
vacated their respective premises. Therefore, for the time being, it did not
impose any restrictions on the grant approval for proposals/applications for
the re-development projects including the construction of sale component
buildings under schemes sanctioned by the Slum Rehabilitation Authority (SRA).
However, it held that restrictions would have to be imposed on consideration of
fresh proposals/applications submitted for new construction of the buildings
for residential or commercial purposes.

 

Finally, the Bombay High Court
placed the following curbs on new development/construction in Mumbai:

 

(a) Development
permissions shall not be granted either by the MCGM or the State Government on
the applications/proposals submitted from 1st March 2016 for
construction of new buildings for residential or commercial use including
malls, hotels and restaurants. Such applications would be processed, but the
commencement certificate shall not be issued. However, this condition would not
apply to all the redevelopment projects and to the buildings proposed to be
constructed for hospitals or educational institutions. It would also not apply
to proposals for repairs/reconstruction of the existing buildings which do not
involve use of any additional FSI in addition to the FSI already consumed.

 

(b) Even
if there was an amendment of the Regulations made hereafter providing for grant
of additional FSI in the city, the benefit of the same shall not be extended to
the building proposals/ Applications for development permissions including for
the re-development projects submitted on or after 1st March 2016.

 

Supreme
Court’s Order

Aggrieved by this total ban on new
construction, the Maharashtra Chamber of Housing Industry approached the
Supreme Court by filing a Special Leave Petition. The Supreme Court gave its verdict
in Maharashtra Chamber of Housing Industry vs. Municipal Corporation of
Greater Mumbai, SLP(Civil) No. D23708/2017, Order dated 15th March
2018.

 

We make it clear that this order is
not intended to set aside or modify the aforesaid impugned judgement. We have
considered the matter only in order to explore the possibility of safe method
of permitting certain constructions in the city of Mumbai for a limited period
to pave the way for further orders that may be passed. We are satisfied that a
total prohibition, though selective, has serious ramifications on housing
sector which is of great significance in a city like Mumbai. It also has a
serious impact on the financial loans which have been obtained by the
developers and builders. Such a ban makes serious inroads into the rights of
citizens under Article 19, 21 and 300A of the Constitution of India. It might
be equally true that the activities and the neglect in disposing of the debris
invades the rights of other citizens under Article 21 etc. That issue is
left open for a proper determination.

 

The Supreme Court passed an Order
presenting the following solution:

 

(a) It
directed that any construction that was permitted hereafter for the purpose of
this order would be only after adequate safeguards were employed by the
builders for preventing dispersal of particles through the air. This would be
incorporated in the building permissions.

 

(b) According
to the MCGM, 10 sites had been located for bringing debris onto such specified
locations which require to be filled with earth. In another words, these sites
require land filling which will be done by this debris.

 

(c) The
MCGM would permit a builder to carry on construction on its site by imposing
the conditions in the permission, that the construction debris generated from
the site, would be transported and deposited in specific site inspected and
approved by the MCGM.

 

(d) The
Municipal Corporation shall specify such a site meant for deposit of
construction debris in the building permission. Any breach would entail the
cancellation of the building permission and the work would be stopped
immediately.

 

(e) The
Municipal Corporation would not permit any construction unless it has first
located a landfill site and has obtained ‘No Objection Certification’ or consent
of the land owner that such debris may be deposited on that particular site.
The Municipal Corporation shall incorporate in the permission the condition
that the construction was being permitted only if such construction debris was
deposited.

 

(f)  For
Small generators of Construction and Demolition Waste, the Waste would be
disposed of in accordance with the ‘Debris On-Call Scheme’ of the MCGM. 

 

(g)
For Large generators of Construction and Demolition Waste, the waste would be
disposed of as per the Waste/Debris Management Plan submitted by the
owner/developer at the time of applying for permissions and as approved by the
BMC.

 

(h) Builders
applying for permissions would have to give a Bank Guarantee of amount ranging
from Rs.5 lakh to Rs.50 lakh depending upon the size of the project and mode of
development, which bank guarantee shall remain in force solely for the purpose
of ensuing compliance of the Waste Management Plan/Debris Management Plan
approved by the MCGM, till the grant/issuance of the Occupation Certificate.

 

(i)  The
MCGM was instructed to submit a detailed report to the Supreme Court after the
expiry of 6 months from the date of the Order (i.e., 15th September
2018) and till such time the Supreme Court’s Order would remain in force. It
also ordered that no construction debris would be carried for disposal to the
Deonar and Mulund dumping sites.

 

Conclusion

While
the High Court’s Order may appear harsh, sometimes desperate situations call
for desperate measures. At the same time, it is laudable that instead of
adopting a very technical or legal approach, the Supreme Court has come out
with a workable solution. One only wishes that the MCGM and the State
Government come out with a concrete action plan to tackle this menace of solid
waste management!